DRC Home | Committees | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

East Design Review Case Report

ST. VINCENT CHARITY HOSPITAL SIGNAGE

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

East Case #  EAST 2010-010

Address: E 22nd & Community College
Owner/Rep: Agile Signs / Lou Belknap
Architect:
Description: hospital campus signage
Notes:  

Committee Actions/Submissions

Committee: BRD CPC
Action Date: November 23, 2010
Action Type: Revised Plan Submission
Conditions/Notes:  
Committee: BRD CPC
Action Date: November 23, 2010
Action Type: Approved with Conditions
Conditions/Notes:  
Conditions: 1) increase size of international parking symbol on sign locations 1, 3, 4, 5, 6, 7, & 9; 2) Reduce logo size on sign location 15, change arrow to opposite of word "Enter," and raise text up from sign bottom to make sign more readable
Committee: BRD CPC
Action Date: October 26, 2010
Action Type: Plan Submission
Conditions/Notes:  
Committee: BRD CPC
Action Date: October 26, 2010
Action Type: Tabled
Conditions/Notes:  
Dimensions and scale of all signs need to be accurate as manufacturer stated the monument signs measured 69" instead of 90". Applicant will provide photographs of existing conditions (signage).