Near West Design Review Case Report

ORCHARD SCHOOL OF SCIENCE

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Near West Case #  NW 2010-027

Address: 4200 Bailey Avenue
Owner/Rep: Cleveland Metropolitan School District
Architect: Anne Hartman, Ralph Tyler Companies
Description: Demolition of existing school, construction of new school
Notes:  
Project consists of the demolition and site preparation (3.25 acres) of the existing Orchard School of Science K-8 site located at 4200 Bailey Avenue at West 44th Street. The existing brick structure is currently in the demolition phase. The abatement has been completed and demolition will be completed in November 2010. The site will be graded and seeded in preparation for the new construction which is scheduled to begin in January 2012. The new school structure will be a 3-story, 64,300 S.F. building accommodating 450 Pre-K thru 8th grade student population. Proposed building materials will primarily be masonry - combination of color and textured brick/block as well as accents of colored metal panels. The site will include separate drop-off areas for students arriving by car vs those arriving by bus. The existing decorative fence will remain on site and will be restored. The grove of trees on the West 44th Street frontage will also remain. Other site features include a playground and open grass areas.

Committee Actions/Submissions

Committee: BRD CPC
Action Date: July 27, 2011
Action Type: Approved with Conditions
Conditions/Notes:  
Near West Design Review Committee approved changes to previously approved site plan, building elevations and exterior details w/understanding that the sponsor explore the substitution of concrete for grass in the tree lawn area adjacent to the Pre-K student drop-off along Bailey Avenue.
Committee: BRD CPC
Action Date: July 21, 2011
Action Type: Revised Plan Submission
Conditions/Notes:  
Committee: BRD CPC
Action Date: April 1, 2011
Action Type: City Planning Commission Approval
Conditions/Notes:  
Committee: BRD CPC
Action Date: March 9, 2011
Action Type: Revised Plan Submission
Conditions/Notes:  
Committee moved to approve the final design development drawings for the school, including the site layout, building massing and materials, w/the understanding that the sponsor will:

1. Relocate the remnant section of the Brinsley Tyrrell decorative fence from atop a retaining wall along the Bailey Avenue building frontage to the front property line of the Bailey Avenue surface parking lot. The removed section of fence will be replaced by either a new version of the Tyrrell fence (assuming additional outside funding can be secured) or by 4'-tall decorative picket fencing identical to that being used to enclose the pre-Kindergarden/Kindergarden playground area.

2. Explore the use of darker-colored panels and breaks in the continuous white-colored parapet wall above the third floor windows in an effort to reduce the building's mass along its east and west elevations.

CMSD willl work with its design team to undertake a design and cost analysis of the proposed changes and present their findings to the Planning Commission at its April 1, 2011 meeting.
Committee: BRD CPC
Action Date: September 17, 2010
Action Type: City Planning Commission Approval
Conditions/Notes:  
Committee: BRD CPC
Action Date: September 8, 2010
Action Type: Conceptual Approval
Conditions/Notes:  
Committee moved to approve the schematic design for the project's site layout, building massing and materials with the understanding that the sponsor will re-study the facade-specific issues raised by the Committee, the most prominent of which is the enhancement of the west facade, from Bailey Avenue north to Orchard Avenue.
Committee: BRD CPC
Action Date: September 1, 2010
Action Type: Plan Submission
Conditions/Notes: