DRC Home | Committees | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

Northeast Design Review Case Report

COLLINWOOD GSA

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Northeast Case #  NE 2009-014

Address: Corner of East 152nd & South Waterloo
Owner/Rep: Brian Osborn, Parkstone Capital Partners
Architect: David Young
Description: New construction of 11,175 square foot office facility on vacant lot.
Notes:  
Preliminary meeting was held on May 19th at 10:30 a.m.
see staff report for details.

Committee Actions/Submissions

Committee: BRD CPC
Action Date: April 6, 2010
Action Type: Approved with Conditions
Conditions/Notes:  
Motion to approve with the condition that the outer edge of the hand rails are extended along the outer curve through the flat area.
Committee: BRD CPC
Action Date: March 29, 2010
Action Type: Plan Submission
Conditions/Notes:  
Resubmission of plan for ramp, as required by previous motion.
Committee: BRD CPC
Action Date: June 19, 2009
Action Type: Approved with Conditions
Conditions/Notes:  
City Planning Commission approved the project based on the Northeast Design Review committee's recommendations. The CPC's approval was contingent upon those issues which still need further development, including having the following items resubmitted: 1). Sign package detailing (three signs - building signage, monument sign, and the historical marker). 2). Further details of the dumpster enclosure, including the fencing detail and the height of the enclosure. 3). Review of the walkway from the bus stop, looking at grade change.

Also, an additional bike rack is to be placed at or near the entrance of the facility.
Committee: BRD CPC
Action Date: June 18, 2009
Action Type: Revised Plan Submission
Conditions/Notes:  
Revised plans submitted to staff with committee's recommendations addressed.
Committee: BRD CPC
Action Date: June 16, 2009
Action Type: Approved with Conditions
Conditions/Notes:  
Motion to approve the project was contingent upon the following conditions: 1). The applicant must resubmit a 3-dimensional rendering of the dumpster enclosure, which must meet the committee
Committee: BRD CPC
Action Date: June 15, 2009
Action Type: Revised Plan Submission
Conditions/Notes:  
Plans resubmitted for final approval.
Committee: BRD CPC
Action Date: June 2, 2009
Action Type: Approved
Conditions/Notes:  
Motion to table and for applicant to submit revised plans per the committees recommendation for the June 16th meeting.
Committee: BRD CPC
Action Date: May 19, 2009
Action Type: Plan Submission
Conditions/Notes:  
preliminary meeting held. design review committee package will be recieved one week prior to our June 2nd meeting.